Industrial Decarbonization

using Electric Thermal Energy Storage (ETES)

Electrification of industrial processes
ETES enables you to electrify the production in your plant. ETES matches the stable demand of high-temperature processes with the fluctuating energy generation from renewable sources. Exploit energy price volatility and heat recovery opportunities.
Contact our ETES team

Get in touch with us and discover what ETES has to offer for you.

etes@siemensgamesa.com
Capacity
Scalable
Nominal power
Adaptable
Technology
Mature
Special features
Clean & safe
Key facts
  • Customizable and highly flexible to meet the individual requirements of the industrial process
  • Proven & demonstrated technology
  • Long-duration energy storage with low-cost storage materials
Recommended for

Medium to high temperature heat consumer (up to 800°C)

Added value
Enabling electrification of industrial processes
Benefitting from fluctuating electricity prices
Utilizing combined heat and power generation
Securing 24/7 heat supply
Upgrade industrial plant with thermal energy storage
Benefits
  • Achieve lower energy costs
  • Increase share of renewable energy and reduce CO2 footprint of industrial process
  • Flexible supply of process heat ensures continuous production
  • Become a recognized sustainable company
  • Become independent from increasing fuel and CO2 prices
Technological highlights
ETES is based on mature and proven technology. The non-hazardous materials and the feasible process parameters enable a secure and safe process operation.
Abundantly available and low-cost storage material, with the possibility to use storage modules, leads to significant economies of scale.
Due to the used materials and the operating conditions, the barriers to get permission for installation are very low. In combination with the geographical flexibility ETES is highly available for integration.
How the ETES team can support you?
Individual Assessment

Customer-specific advice through:

  • Technical workshops with our experts
  • Analysis of potential applications and identification of the best use case
  • First technical setup and commercial evaluation
Full Feasibility Study

Joint working group for:

  • In-depth analysis of the previously defined use case
  • Conceptual engineering and business case calculation
  • Basis for decision making
Project Realization

Dedicated project team for:

  • Project Management
  • Basic and detailed engineering
  • Erection and commissioning of the storage plant

Share

Further information about data protection can be found in our privacy policy.